Process engineering for injection molding

PolyIQProcess

Setup sheets calculated for your press, mold and grade, the five standard molding studies, and defect troubleshooting, with the calculation shown behind every number.

Request a walkthrough

Setup sheet

Hot runner cap · 4 cavities

Tool from PolyIQPolyIQPolyIQ Tooling

Sample 55 t all-electric · sample press

  • Barrel utilization48 %passes
  • Melt residence time1.1 minpasses
  • Clamp force30.3 % of presspasses
  • Gate shear rateneeds gate sizenot calculated
  • Screw surface speed0.3 m/spasses
Melt temperature
225 °C
Mold temperature
40 °C
Fill time
1 s
V/P transfer at
96 % of fill
Pack / hold pressure
2,074 psi plastic
Hold time
4.3 s
Cooling time
14 s
Estimated cycle time
23.3 s

Every value is an estimate from PP family data, not a supplier datasheet. Add the grade's datasheet and they become datasheet values.

Calculated by the PolyIQPolyIQPolyIQ Process engine for the hot runner cap shown on the Tooling page (4 cavities, PP, 23.7 g shot, valve-gated) on a sample 55 t press: the press checks pass (gate shear waits for a gate size), cycle about 23.3 s. On a 110 t press with a larger barrel the same job fails the barrel-use check.

Setup sheets calculated for the press

Press, mold and grade produce a starting process with ranges and the source of each value. Shot size, residence time, clamp, gate shear, cooling and fill rate are calculated for the specific machine and checked against its limits.

Grade limits

Melt and mold temperature, drying, shear and residence limits come from the grade data where it is available.

Defect troubleshooting

Likely causes and corrections in order, kept inside the press limits, with the side effects of each change shown.

Molding studies

Viscosity curve, cavity balance, pressure drop, gate seal and process window, each saved against the mold and press.

Linked to the Tooling job

Bring a checked tool in from PolyIQPolyIQPolyIQ Tooling, with its concept settings offered as labeled starting points. Measured shrink, cycle and pass or fail go back to the Tooling job as validated, for that tool revision only.

Saved runs

Each saved run records what changed and the result, so the next shift starts from the last good process.

For process engineers first.

PolyIQPolyIQPolyIQ Process shows the calculation behind every number. The engineer decides what runs; the saved result is there for the next shift, the next job and the next plant.